Regular Members

Hebeihaihao High Pressure Flange&Fitting Group Gee Pipe Mill Co,.Ltd

Hardware

Product category
  • N/A
Search
 
Friends links
  • N/A
Supplier Homepage > Products > ASME B16.9 16" *SCH40 A234 WPB Carbon Steel Tee
ASME B16.9 16" *SCH40 A234 WPB Carbon Steel Tee
Click on the image to check the artwork
product: view count: 101ASME B16.9 16" *SCH40 A234 WPB Carbon Steel Tee 
unit price: Negotiable
min amount:
amount:
period for delivery: Consignment Deadline days
Expiry date: Long Effective
last update: 2017-11-27 23:46
  enquiry
detailed

 

GEE ASME B16.9 16'' *SCH40 A234 WPB Carbon Steel Tee,Moq:1pc.Brand:GEE GEE Belif : Global Excellent Exporter ,More than Made In China.

We are not only Manufcturer , we also a transmitter of More than Made In China.

Company:

Hebei Haihao High Pressure Flange &Pipe Fitting Group

Gee pipe Mill Co.,Ltd.

Status:

Manufacturer from 1982 year with 660 workers

Trade mark Brand:

GEE

Certificate:

ABS ,ISO9001:2008 ,API 6H ,CE
Manufacture License of China Pressure vessels.

Lab:

Laboratory of CNAS

Mainly Products:

Steel Flange Steel Elbow

Steel Tee Steel Reducer

Gasket bolt&nut

Progress:

Forged and Hot rolled

Size:

1/2“--58”

Carbon steel& Stainless Steel &Alloy steel& Duplex Stainless

Standard Mark:

GEE/ OD WT /Pressure / Standard / Material /Heat number

MOQ:

1 piece

OEM & Drawing:

Accept

Sample cost:

we don't offer free samples,but will reimburse the buyer once an order is confirmed.

GEE Advantage:

For Project :we have the best Quality

For Wholesaler: we have the best price and OEM .

For Retailer : we have the different Package style .

(Elbow/Tee/Reducer/Cap)1/2”-80”/Sch10-160 XXS

Material:CS:ASTM A234 WPB/MSS-SP-75 WPHY42/46/52/56/60/65/70

ASTM A420 WPL3/6 (Low Temp)

SS:ASTM A403 WP 304/304L/316/316L/321/317/310/347

AS:ASTM A234 WP1/5/9/11/22/91

Standard:ASTM/ANSI/JIS/DIN/GB


Main Advantages:

1.Material:According to the standard and approve ISO,ABS certificates.

Accept client’s test.

2.Package:as per standard or client’s requirements.

3.Delivery Time:

Storage: within 7 days;

Production: usually 30 days, large quantity as per the factory production schedule.

Production capacity: 1000 MTS per month

4.History:Manufacturing 32 years experience.

5.Brand:GEE Pipe

 

inquiry list